New facilities for the Air C2 (Command and Control) Force have been officially opened at RAF Leeming in Northallerton. This project, valued at approximately £15 million, is the first to be completed under a significant contract with the Ministry of Defence (MOD).
The new infrastructure includes offices and a 32-bed Single Living Accommodation block. Construction for the project, managed by the Defence Infrastructure Organisation (DIO), began in September 2025.
Galliford Try was awarded the contract to develop the design and deliver the infrastructure, with Arcadis providing design assurance. The buildings incorporate sustainable features such as pre-cast concrete construction for energy efficiency, air source heat pumps, solar panels, and rainwater harvesting.
Air Officer Commanding 2 Group Air Vice-Marshal Anthony Lyle and Commander Air Bases, Air Commodore Simon Blackwell, received the buildings from DIO. Nicola Bond, DIO's project manager, stated that the Air C2 Force can now complete their move to RAF Leeming, supporting their vital work.